Our project has a diesel backup generator. Which baseline HVAC system do I use if my building has no heating or air conditioning? What should I use?Ĭan the Passive House Planning Package (PHPP) be used to energy model for LEED?Ĭan the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet? The Section 9 space-by-space method does not include residential space types. How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1? Department of Energy, ASHRAE has posted the I-P edition of ANSI/ASHRAE/IES Standard 90.1-277, Energy Standard for Buildings Except Low-Rise Residential Buildings, as a free, downloadable PDF.
#Ashrae 90.1 pdf 2007 appendix g code#
How do I provide a zip code for an international location?įor a project outside the U.S., how do I determine the climate zone?įor a project outside the U.S., how do I determine the Target Finder score?ĭo hotel rooms need automatic light shut-off control? ASHRAE Standard 90.1-2007 Available As Free Download Through a funding contract with the U.S.
![ashrae 90.1 pdf 2007 appendix g ashrae 90.1 pdf 2007 appendix g](https://cdn-codes-pdf.iccsafe.org/bundles/document/new_document_images/1629/Fig06.jpg)
![ashrae 90.1 pdf 2007 appendix g ashrae 90.1 pdf 2007 appendix g](https://images.slideplayer.com/13/3613834/slides/slide_15.jpg)
How should this be accounted for?Ĭan mezzanines open to floors below be excluded from the energy model? The project is built on a site with existing exterior lighting installed. Should I use that for my documentation, or 90.1-2007?Ĭan I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements? Our local code references ASHRAE 90.1-2010. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p Despite our efforts to make an efficient HVAC design, the cost savings are minimal.
![ashrae 90.1 pdf 2007 appendix g ashrae 90.1 pdf 2007 appendix g](https://www.researchgate.net/profile/Peter-Armstrong/publication/241964438/figure/tbl3/AS:669975819853841@1536746091579/Categorization-of-2003-CBECS-Data-for-Benchmark-Buildings_Q320.jpg)
Our project has a large process load-75%. Can we exclude it from our model?įor an existing building, do I need to rotate the model? Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?Ī portion of our building envelope is historic.